TSR Boeing 737-NG and electronic checklist installed / (Technical Service Richter)

13.12.2008
neue sixpacks eingebaut / new sixpacks installed / (cockpitsonic.de)

15.07.2008
fire handle eingebaut / fire handle installed / (cockpitsonic.de)

18.03.2008
Hydr. brake pressure Anzeige eingebaut / Hydr. brake pressure indicator installed / (cockpitsonic.de)
TSR Autobrake software installiert -> http://www.aerosoft.de/cgi-local/rd/iboshop.cgi?showd,,D10687

20.02.2008
NG style pressure panel eingebaut / NG style pressure panel installed / (cockpitsonic.de)


12.02.2008
NG style electrical panel eingebaut / NG style electrical panel installed / (cockpitsonic.de)


02.02.2008